Our team has a wealth of experience across all markets.
Class A Office
Herlocker Mechanical Systems delivers the sophisticated work and quick turn-over Class A office buildings require. We are well-versed with new build multi-story core and shell, upfits and existing multi-tenant structures.
Movement Mortgage I and II (Fort Mill)
- – New build Design Build – Plumbing
- – 100k sf each – 3 stories
- – GC: Choate
BB&T Call Center (Greenville, SC)
- – New build Design Build – Plumbing
- – 140k sf – 3 stories
- – GC: Shelco
Saertex Logistics Office (Huntersville, NC)
- – Design Build – HVAC
- – VAV Rooftops
- – GC: Barringer Construction
Chobani
- – Plan and spec upfit – HVAC
- – Hurst Tower – Charlotte
- – GC: Shiel Sexton
Educational
Herlocker Mechanical understands the qualities and rigors of executing state construction educational building work.
UNCC South Village Dining Hall
- – 2 story dining hall – Plumbing – new build
- – 7 separate kitchens, Solar hot water system
- – Insulated and heat traced grease waste system
- – Fully commissioned
- – GC: JV Shelco/Tyler 2
RCCC ACT
- – 3 story education – HVAC – new build
- – Rooftop VAV system Trane Controls
- – Fully commissioned
- – GC Rodgers Builders
CCTC ACT
- – Renovation – Plumbing
- – Domestic water, sanitary, Compressed air and gas
- – GC: Rodgers Builders
Food Processing
Our expertise and attention to detail help navigate the complexities and health code requirements unique to food processing and food delivery facilities.
B Roberts
- – Renovation of existing warehouse – Plumbing
- – Bakery processing plant
- – Design Build
- – GC: AM King
Gordon Foods
- – New build – Plan and Spec
- – HVAC and Plumbing
- – Refrigerated warehouse and 2 story office
- – GC: Whiting Turner
Cheney Brothers
- – Multiple projects – Design Build
- – HVAC and Plumbing
- – Food processing and distribution
- – GC: AM King
Healthcare
Herlocker understands the challenges renovations and new building can present to health care operations. Our experience helps expedite the installation of HVAC and plumbing systems to minimize impact.
CMC Pineville New Tower Expansion
- – Plumbing Plan and spec
- – Tie-in to existing hospital and renovation above operating ER
- – GC KBR/BE&K
CMC Pineville MOB
- – Design Build Plumbing and Med Gas
- – 4 story MOB
- – Shell and Upfit separate but run concurrently
- – GC: Rodgers Builders
Valley Gate Dental Surgery Center
- – Plan and Spec Dental Ambulatory Surgery Center
- – Plumbing, HVAC, and Med Gas
- – DHSR inspections
- – GC: AM King
Industrial/Distribution
With over 20 million sq ft. built, Herlocker Mechanical Systems excels at industrial process and large distribution warehouse design builds.
Staples Warehouse (Distribution)
- – 1 million sq ft
- – Design build plumbing
- – GC: Choate
Sterigenics (Industrial)
- – Multiple projects
- – Process piping – steam, Ethylene Oxide, exhaust and scrubber systems
- – Equipment installation and modification
Haile Gold Mine
- – Design Build Truck Maintenance lubrication system
- – 6 pipe lubrication system utilizing Air Diaphragm Pumps
- – GC: JM Cope
© Copyright 2023 Herlocker Mechanical Systems, Inc. - All Rights Reserved. 10925 Westlake Dr, Charlotte, NC 28273 704.962.3760 (o) 704.962.3763 (f) NC 19285 | SC 106947